Project Overview
Client: Kier Highways
Sector: Highways and Infrastructure
Location: Southbridge, Northampton
Duration: 3.8 weeks
Project Value: £80,000
Project Overview
Working with Kier Highways, part of the Kier Group, PGR recently completed essential safety repairs to Southbridge in Northampton, to fix structural parapet damage caused by a vehicle collision.
The scope of our work included removing and replacing the existing stone balusters, blocks and some stonework on this historic stone bridge. In total, we installed 12m of new parapet along the bridge.
PGR also worked closely with Kier and subcontractors in planning and creating a temporary works design for an engineered floating platform with scaffolding.
Access challenges
The works on Southbridge required access to the waterside face so that the PGR team could carry out repairs to the stone parapet over the Grand Union Canal.
Conventional land-based access was restricted by the watercourse, so the project required a floating platform capable of supporting a scaffold structure while maintaining a controlled and stable working area.
This is where FPS Pontoon Hire came to the rescue supplying an 11.52 m × 5.28 m engineered floating work platform. This provided a solid working base for scaffold access, allowing the stone bridge repair works to be carried out safely by our team.
FPS explained: “Careful sequencing was important: the pontoon had to be fully installed, restrained and ready before the scaffold team could begin. This required coordination between the pontoon designer, scaffold designer, principal contractor and site team.”
Supply Chain Partners
Throughout this stone bridge repair project, our in-house team worked together with valued key supply chain partners including:
FPS Pontoon Hire | Bullimores Plant Hire | Sandwell Scaffold | GAP Group| Reactive Hire | Haddonstone | vp ESS